The Debbie and Larry Rawls Project

Interior Framing and Roofing

As soon as the outside of the building was framed in, the roof in place, and felt on the rood, the inside framing was accomplished. These pictures were taken on January 30, 2008.

 

FUMC Home

 

Self Help Housing Home

Project Phases

Rawls main project page

Demolition

Foundation and flooring

Exterior , Siding, flooring, final roofing, and interior finishing

Home dedication

 

 

       

Mrs. Rawls stands on the original steps that were left in place. Four generations of this family entered the former house by these steps; now they will be available for the next 4 generations.
 

 

 

 

The back porch being completed