|
The New Playground at the Methodist Christian School
|
||
The Methodist Christian School held a Grand Opening for the new playground on February 17, 2010. The playground cost approximately $8,000 to build. It consists of a special rubberized surface that meets state licensing requirements and equipment that is age appropriate for our students. Landscape Specialists (John Pollock) did the work of preparing the foundation and installing the rubberized surface. The first few pictures are of his team installing the surface.
Double click on thumbnails to see enlarged picture!
|
|
|
|
|
|
|
|
|
The kids get ready! |
|
|
Just before the crowd shows up |
Waiting for it to happen! |
|
|
|
|
|
|
|
|
|
|
|
Cutting the ribbon |
|
|
|
|
|
|
Open House after the Grand Opening |
|
|
|
|
|
|
|
|
|
|
|
|
||